User:Legion/Works/Worklog
< User:Legion | Works
8 May 2015
- Completed the installation of new windows in the House of Commons chamber.
- Expanded the glass roof over the House of Commons and pushed the public galleries on both east and west sides further a bit.
- Speaker's Throne in parliament chamber receives a sort of armrest tables on both sides to hold books for use by the Speaker.
9 May 2015
- Increased diffuse on exterior walls, roofs, and grasses surrounding the Palace of Hollowminister in New Cypress Hollow to brighten them up.
- Changed exterior walls on parliament building to brick texture
- Added a terrace next to the entrance to the parliament building, with a stair to the sidewalks.
10 May 2015
- Raised the public galleries in the parliament chamber and the mezzanine in the lobby.
- Added new terraces adjoining the south front and west side of the parliament lobby section.