Summerville: Difference between revisions

From Virtual Paradise Wiki
Jump to navigation Jump to search
(:^))
Line 5: Line 5:
|running={{yes}}
|running={{yes}}
|founded =In Blizzard mid 2013
|founded =In Blizzard mid 2013
|nation=Independent
|nation=*Iceman Administrative Government (2011-2011)
*Independent (2013-present)
}}
}}
[[Image:Summervilleflag.png|300px|right|Summerville's flag]]
[[Image:Summervilleflag.png|300px|right|Summerville's flag]]

Revision as of 14:59, 22 December 2016

Summerville
Summervillenewcityhall.jpg
City of Virtual Paradise
Leader(s)
  • graystripe
  • snowkitty24
Founded

In Blizzard mid 2013

Affiliations
  • Iceman Administrative Government (2011-2011)
  • Independent (2013-present)
Website

?

VP Suite

?

Summerville's flag

Page still undergoing changes

Summervilles backstory

Summerville is a city within the world of Blizzard started, and mainly constructed by graystripe meant to recreate the past. Construction of VP-Summerville started in April of 2014, and properly established as a city in early 2015. Originally, it was founded as a tiny tourist building/roleplay community in AWTeen back in early 2010. Pre-war Summerville had created a small community of its citizens being able to build, and role play freely as they pleased. Summerville in late 2011 became known for it's weeks-long defense against vandalism attacks from the Icemen and ultimately contributed towards an end to of years of hacking and vandalism within the AW community. It eventually relocated over to Virtual Paradise nevertheless, as the fear of future griefing efforts never really died out until much later. The VP version of Summerville is themed vastly different from it's more famous counterpart, but otherwise retaining most of it's original culture and community.

Summerville itself is regarded as an independent city with no ties to any established nation in the world as of 2016.

Location

The current location of the VP-based Summerville is set up far away from the GZ, and can be reached at the jump !j svch (Still current as of 2016)

City Points of Intrest

City HallThe logo found on the City Hall sign


-more coming soon-

Mass Renovation Project

As of July 1st of 2016, Summerville is undergoing a massive renovation project, see more information below.

The 'old city'

While an embarrassment due to its low quality of build, the old city is however closely layed out to the original Summerville, retaining some original build quality and original builds like the location of the GZ, the presence and style of the wall behind the GZ, a (former) river north of the GZ, and the several houses lined up to the right of the GZ were all in pre-war Summerville one way or another.

While almost all the buildings have been emptied and the old city being marked for complete demolition, it can still be visited publicly, but as of 15/20/2016 the jump has been removed. Its South of City Hall.


Pictures of the old city

Prior to renovation  Shut Down Ditto Arial view of old city

Mass Renovation Project Plans and Projected Goals

The basic outline of the renovation project is meant to scrap, and reuse elements and builds of the old city, and rebuild it to reflect a higher standard of quality and build.

The projects main goal is to expand Summerville even greater then its original counterpart in AWTeen in 2010 - 2011. The original plans in AWTeen for Summerville was to make a extensively sized city that would not only offer the public building among the community, but to also look like, and feel like a functioning city, rather then a small town with few buildings. The original AWTeen Summerville had visions to also have extensively developed areas spanning over a decent land size, but they never came to be or were ever even planned out due to Summervilles premature death due to vandalism

A new standard of building quality is also another major goal of the project. The original building quality of Summerville in general in 2010 wasn't really the best, and it defiantly could of been improved at the time. The project is meant to take the quality above and beyond what Summerville ever had before. An example of what kind of quality will be present can been seen within the current City Hall (See picture above in upper right of page).

Another goal of the project is to bring back some builds original to Pre-war Summerville found in 2010 - 2011. It will not only bring back these old builds, but also expand and improve apoun them. Such examples have not yet been started at the time of writing, but future building will introduce the new concept.

"When will the Renovation Project be deemed finished?"

The end of the project will not be the end of development and growth in Summerville, the Renovation Project is meant to get Summerville to a sustaniable size, establishing key city areas, and key city buildings, aswell as proper areas of plots of land that people may build in. While these key areas, and buildings have not be planned yet, there is a whole list that could be made of things a city has and needs to seem realistic

There wont be a true ending to Summerville's development, and if there is, it will be in the far future.

Renovation Project Updates and Timeline

(This timeline will be updated regularly until the renovation project is deemed finished)

____________________________________________________________________________________________________________________________________________________________________________________________

-Project started July 1st, 2016-

City Hall building starts construction in the renovation project, and will be the general city center. General area of campus, and the shell of City Hall also laid out. (7/1/2016)

  • Shell of City Hall, and campus general layout complete (7/4/2016)
  • Interior work of City Hall begun (7/12/2016)

-- Several months of construction downtime due to unforeseen consequences (August - November) -- Planning still being done in downtime

  • Construction started up again mid Novmeber (11/23/2016)
  • City Hall undergoes cosmetic, and small campus layout changes (11/26/2016)
  • Currently the streets around City Hall, the City Hall interior, and the rest of the City Hall campus is still undergoing completion.

More streets, and other buildings have begun the planning process (11/28/2016)

  • Secondary City Hall campus building shells both finished (took long enough) (11/29/2016)
  • More road work (11/30/2016)
  • Finalized City Hall teleport point + City Hall sign (14/2/2016)
  • Even more road work
  • Interior work on City Hall has started (work on interior will be on and off) (12/4/2016)
  • Something special has started construction in one of the City Hall secondary buildings (12/7/2016)
  • The Special thing has been deemed a restaurant on the City Hall campus.
  • Still needs a name. (12/13/16)
  • Summervilles GZ has begun early planning stages (12/14/16)
  • More GZ planning (12/20/16)