Blizzard GZ Road Project/Logs

From Virtual Paradise Wiki
Revision as of 17:27, 11 September 2013 by Legion (talk | contribs) (+cat Category: Projects)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

2013

May

  • 27 - Begun construction on Morningwood Lane extension.
  • 31 - Named the mostly 4-lane road running along the south-north route past Hicks Tower, Blizzard Arena, and to cube3 hotel-casino project the Sunset Boulevard.

June

  • 02 - Widened section of road in West Blizzard between BNR rail terminal and Legion's skyscraper lot to 3 lane.
  • 02 - Replaced the road island section in West Blizzard's Industrial District between VP Brewery and Chris D's warehouse with 4-lane section.
  • 02 - Repaved the section of Industrial Drive in West Blizzard's Industrial District between Chris D's warehouse and Legion's skyscraper lot; Added parallel parking space next to it.
  • 03 - Moved the sign and its support beams a bit further back at section of Sunset Boulevard in West Blizzard's Sunset Strip district between VP Gas Station and Legion's skyscraper lot.