Blizzard GZ Road Project/Logs: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
+cat Category: Projects |
||
Line 9: | Line 9: | ||
*02 - Repaved the section of Industrial Drive in ''West Blizzard's'' '''Industrial District''' between Chris D's warehouse and Legion's skyscraper lot; Added parallel parking space next to it. | *02 - Repaved the section of Industrial Drive in ''West Blizzard's'' '''Industrial District''' between Chris D's warehouse and Legion's skyscraper lot; Added parallel parking space next to it. | ||
*03 - Moved the sign and its support beams a bit further back at section of '''Sunset Boulevard''' in ''West Blizzard's'' '''Sunset Strip''' district between VP Gas Station and Legion's skyscraper lot. | *03 - Moved the sign and its support beams a bit further back at section of '''Sunset Boulevard''' in ''West Blizzard's'' '''Sunset Strip''' district between VP Gas Station and Legion's skyscraper lot. | ||
[[Category: Projects]] |
Latest revision as of 17:27, 11 September 2013
2013
May
- 27 - Begun construction on Morningwood Lane extension.
- 31 - Named the mostly 4-lane road running along the south-north route past Hicks Tower, Blizzard Arena, and to cube3 hotel-casino project the Sunset Boulevard.
June
- 02 - Widened section of road in West Blizzard between BNR rail terminal and Legion's skyscraper lot to 3 lane.
- 02 - Replaced the road island section in West Blizzard's Industrial District between VP Brewery and Chris D's warehouse with 4-lane section.
- 02 - Repaved the section of Industrial Drive in West Blizzard's Industrial District between Chris D's warehouse and Legion's skyscraper lot; Added parallel parking space next to it.
- 03 - Moved the sign and its support beams a bit further back at section of Sunset Boulevard in West Blizzard's Sunset Strip district between VP Gas Station and Legion's skyscraper lot.